
Add to Cart
Product Specifications:
Description | Timing Belt, Gear Belt |
Part Number | B100DS5M550 |
Suitable for Model | Yin Cutter / Takatori Cutter |
Package | 1pcs/pp bag, Shipping by foam cotton and Carton for protection. |
Net Weight | 0.022kg/pcs |
Delivery Time | In stock, we can send out within 24 hours after payment |
MOQ | Less quantity or 1pcs is avaliable |
Payment Term: | T/T, Western Union, Paypal, LC at sight |
1. Toothed belt can mitigate the impact of load
2. Toothed belt running smoothly, low noise, low vibration
3. Toothed belt transmission structure is simple, easy to adjust
4. Easy to install: can save time and reduce downtime for garment manufacturers
5. Overall: Improved accuracy, durability, safety, ease of installation, and Save your cost and time
Products Picture:
More Spare Parts for Cutter YIN:
Part Number | Description |
CH08-02-17 | SLIDE BLOCK |
YTB3*132 | ROUND BELT |
TLA48Z | NEEDLE BEARING |
CH08-02-28 | NEEDLE ROLLER |
YTB3*240 | ROUND BELT |
90-J-3 | BELT |
H2TAC42004 | BEARING PIPE 5cm |
A1TAC07017 | SLIDING SLEEVE |
B100DS5M550 | TIMMING BELT |
CH08-01-10 | TIMING PULLEY |
CH08-01-06 | IDLE PULLEY |
CH08-01-43 | CONNECTION ROD (UPPER) |
ROD ASSEMBLE | ROD ASSEMBLE |
3*290 | ROUND BELT |
604ZZ | BEARING |
CH08-02-27 | METAL |
CH08-04-14 | MIDDLE PULLEY |
3X355 | ROUND BELT |
3x390 | ROUND BELT |
CH08-01-44 | ECCENTRIC SHAFT |
CH08-04-11H3-2 | GRIND STONE |
LMH-10LUU | LINEAR BUSH |
NF08-02-06 | SLIDE BLOCK |
NF08-02-11(T) | TWIST ROD |
CH08-02-23W2.0 | TOOL GUIDE (L) |
CH08-02-03 | TWIST ROD |
CH08-02-18 | TOOL GUIDE (U) |
CH08-02-23W1.6 | TOOL GUIDE (L) |
You may want to know:
1. When you will reply my inquiry?
Normally within 2 hours in working time, we are always trying to reply ASAP.
2. Do you offer sample?
Yes, we offer sample for consumables (blade, stone, bristle). Parts not offer sample but we guaranteed by After-sales service.
3. About the sample, what’s the shipping cost?
It will depend on the weight, and destination, we will inform you if we confirmed the sample details and receive your full delivery details.
4. How to place an order if we agree the quotation?
We'll make Proforma Invoice to you if get your confirmation about the quotation, and we'll included every details on the Proforma Invoice, so you can arrange the payment accordingly.
5. When will you ship out the goods after payment done?
Normally for stock items, we can send out the shipment at the second day if payment received, if not in stock, we'll let you know when we sent you the quotation.
6. Do you have quality guarantee for the products?
Yes, we promise to replace for you if any quality problem of our items.
Please do not hesitate contact us if u have any inquiry or questions, we will do our best for you. Thank you!
More Cutter Parts for YIN: